CPP INSTRUMENTATION & AUTOMATION
Job ID: 2026041801 | SMFAL | Maintenance | Power Plant
Apply
Shri Mahavir Ferro Alloys Private Limited (SMFA) started its operations in 2003-04 with a 100 TPD sponge iron kiln at the Kalunga Industrial Estate in Odisha. The company further expanded the capacities of its sponge iron plant with the addition of a third 100 TPD Kiln along with two 12 Ton induction furnaces with a Continuous Casting Machine (for Billet casting) in the year 2008. Adding one more feather to its expansion program, SMFA commissioned a 12 MW coal-based Captive Power Plant in March 2008 to meet the power requirements of its three 100 TPD sponge iron plants and steel melting shop (SMS).
SMFA has its railway siding, which was approved by the South eastern Railways in the year 2007, and its design and engineering got approved in 2009. The company upgraded the railway siding to a private freight terminal to cater to plants’ requirements and get the benefit from railway policies along with the added business opportunities with the various manufacturing plants in the vicinity. In 2011-12, SMFA ventured into producing power using renewable sources by commissioning a 1 MW solar power plant under the Jawaharlal Nehru National Solar Mission at Tankajoda village in Sundargarh district of Odisha.
Job Objective
Responsible for overseeing all functions of the captive power plant including: Availability of the plant from instrumentation point of view,To meet the KPIs related to instrumentation maintenance,Robust system for continuous improvement in process & people's skills is implemented inshop floors,Safe working environment is provided for all employees in power plant
• Functional Reporting: CPP - Head
• Administrative Reporting: CPP - Head
Key Responsibility Areas
1. O&M
- To control and supervise all the instrumentation activities of the power plant & ash handling unit
- To ensure adherence to all the boiler/TG instruments, sensors, DCS system is running in the plant
- To ensure timely sign off on all the equipment related checklist and flag abnormalities in the ERP
- Monitor adherence to maintenance practices (CLTI, PM, condition-based monitoring schedules etc)
- Planning of shutdown maintenance and monitor effectiveness
- Track effectiveness of maintenance practices
- Inculcate the culture of Root cause analysis (RCA) for breakdowns and improve the quality of RCAs
- Monitor and support teams in implementation of CAPA actions
- Work in close co-ordination with operations & mechanical in-charge for seamless operation of power plant
- To ensure adherence to all the boiler/TG instruments, sensors, DCS system is running in the plant
- To ensure timely sign off on all the equipment related checklist and flag abnormalities in the ERP
- Monitor adherence to maintenance practices (CLTI, PM, condition-based monitoring schedules etc)
- Planning of shutdown maintenance and monitor effectiveness
- Track effectiveness of maintenance practices
- Inculcate the culture of Root cause analysis (RCA) for breakdowns and improve the quality of RCAs
- Monitor and support teams in implementation of CAPA actions
- Work in close co-ordination with operations & mechanical in-charge for seamless operation of power plant
2. Spares / cost
- Ensure consumptions of consumables are as per budgeted figures. Any un-favourable trend should be arrested with timely action plan
- To indent the instrumentation spare parts as and when required – to devise a spare management strategy to ensure zero breakdown due to unavailability of spares
- To indent the instrumentation spare parts as and when required – to devise a spare management strategy to ensure zero breakdown due to unavailability of spares
3. Manpower
- Defines the objectives of workforce and carries out their performance reviews, promotes the quality of the work and motivates his/her personnel
- Ensure no delays in breakdown maintenance due to manpower shortage
- Ensure no delays in breakdown maintenance due to manpower shortage
4. Safety & compliance
- Ensure zero safety incidents & lost time injuries
- Ensure compliance to pollution norms in all plants
- Ensure compliance for IMS standards
- Ensure compliance to pollution norms in all plants
- Ensure compliance for IMS standards
Key Performance Indicators
1. Equipment Availability
- Equipment / instrument wise availability in a month
- Monthly / daily job planning of technicians to ensure availability of equipment
- Monthly / daily job planning of technicians to ensure availability of equipment
2. DCS System Usage
- DCS Systems availability
- Ensuring compliance to usage to DCS system
- Effective use of the system to run the plant in online mode
- Prepare Department wise MIS based on report from DCS back-end
- Ensuring compliance to usage to DCS system
- Effective use of the system to run the plant in online mode
- Prepare Department wise MIS based on report from DCS back-end
3. Maintenance compliance
- Adherence to monthly / weekly / daily - PM / LLF plans
- Adherence to annual shutdown plans and optimize shutdown duration year-on-year
- Adherence to annual shutdown plans and optimize shutdown duration year-on-year
4. Maintenance cost
- Maintain instrumentation maintenance cost less than the budget
- Optimize instrumentation maintenance costs year-on-year
- Optimize instrumentation maintenance costs year-on-year
5. RCA Analysis
- Drive teams to perform root cause analysis for breakdowns / corrective maintenance issues
- Complete RCAs within 2 days
- Compliance to CAPA action points as per defined timelines
- Complete RCAs within 2 days
- Compliance to CAPA action points as per defined timelines
6. Safety & Legal Compliance
- Zero lost time injuries / accidents
- Adherence to stack norms
- Compliance to EHS and other regulatory standards
- Train / coach team members on EHS
- Maintain and monitor 3S standards in your department /circle
- Adherence to stack norms
- Compliance to EHS and other regulatory standards
- Train / coach team members on EHS
- Maintain and monitor 3S standards in your department /circle
7. IMS Compliance
- 100% adherence to ISO / IMS standards
- Implement best practices
- Train / coach team members on ISO / IMS / SOPs
- complete all level 1/2/3 3S activities
- Implement best practices
- Train / coach team members on ISO / IMS / SOPs
- complete all level 1/2/3 3S activities
BASIC QUALIFICATIONS
- Work experience as a Power plant instrumentation in-charge of a 15-20 MW CPP;
- Experience with pressure systems, sensors, DCS systems
- B.E / Diploma in Instrumentation
- Experience with pressure systems, sensors, DCS systems
- B.E / Diploma in Instrumentation
RELEVANT EXPERIENCE
- Min. 8 years of relevant experience required
Apply



